file:
Year:
2 016
Publisher:
JACoW
Abstract:
VEPP-2000 e+/e− collider was constructed in 2006 at BINP. The design luminosity of 1×1032сm−2s−1 may be achieved at filling rate of 1×108e+/e− per second. Old VEPP-2M facility infrastructure provided only 1×107e+/e− per second. We decided to use Injection Complex. The transfer line connects Injection Complex and VEPP-2000 facility. Commissioning of e+/e− transfer line from Injection Complex to VEPP-2000 facility is done in 2016. Both electrons and positrons beams are injected to VEPP-2000 collider.
- Log in to post comments