Since the beginning of the year we were working hardly to bring the beam from booster synchrotron BEP to VEPP-2000 storage ring. Transportation channels with new dipoles capable to work @ 1 GeV were assembled and aligned precisely. The beam step-by-step moved through the beamline controled @ two types of BPMs. The PMT looking directly to the closed orbit of VEPP detected first turns of the decaying beam. And - here it is, captured into VEPP-2000 shining with synchrotron radiation. Presently the vacuum chamber of VEPP-2000 is going through the beam scrabbing procedure to achieve the working level of dynamic vacuum conditions.