First modified BEP "small" D-quad has been delivered from BINP workshop and immediately gone through magnetic measurements tests. The field-current dependence showed good accordance with predictions.
The assembling of lower part (in tunnel) of beams transfer channel K-500 from BINP Injection Complex is finished.
The assembling of BEP-VEPP transfer channels is now in full swing.
With desire to use the the full functionality of beam position monitoring system the calibration of old pickups was started.