file:
Year:
2 016
Publisher:
JACoW
Abstract:
The upgrade of VEPP-2000 e+e- collider injection chain includes the connection to BINP Injection Complex (IC) via newly constructed transfer line K-500 as well as upgrade of the booster synchrotron BEP to the energy of 1 GeV. Modernization has started in the middle of 2013 and now the electron and positron beams with highly increased production rate together with top-up injection from BEP are ready to feed VEPP-2000 ring and provide design luminosity at the whole energy range limited only by beam-beam effects. The design and operation experience of IC damping ring, 250m transfer channel and booster BEP dealing with 2.6T magnets at top energy will be presented.
- Log in to post comments