VEPP-2000 ring is finally assembled and ready for action

All modifications of VEPP-2000 storage ring itself are finished. These changes include: two new dipoles' vacuum chambers with additional inflectors; new mirrors for synchrotron radiation output for beam diagnostics; second screper near CMD-3; repair of solenoid with protective vacuum leakage. Vacuum system is assembled, RF cavity is baked. All magnetic elements are mounted and aligned. Storage ring is ready to accept beams except for the absence of transfer channels and disassembled booster synchrotron.